California Coalition for Rural Housing

Working to ensure affordable housing opportunities for low income and rural households since 1976.

California Inclusionary Housing Policy Database

 

Corte Madera, Marin County

Policy and Jurisdiction Information

Population: 9,100
Land Area (sq mi.): 3.2
Year Adopted: 1989
Compliance Type: mandatory
Policy Type: ordinance
   

Developer Options

Construction Alternatives

  • (not offered)conversion to affordable housing
  • (not offered)credit transfer
  • (offered)in-lieu fee
  • (not offered)land dedication
  • (not offered)off-site construction

In-Lieu Fee Structure: fixed per-unit fee

Amount of in-lieu fee shall be based on the difference between the cost of constructing the affordable dwelling unit and what a low-income family of three can afford. The calculation shall be determined as follow: (1) For purposes of the calculation, the size of the required affordable dwelling unit is established at one thousand five hundred square feet and the cost of construction is assumed to be one hundred twenty-five dollars per square foot. (2) The amount that the low-income household can afford is the sum of two and one-half times sixty five percent of the median household income, adjusted for a family of three, as updated annually by the US. Department of Housing and Urban Development for Marin County. (3) The difference between the results of the calculation in Sections 18.24.120 (a)(1) and (2) above is the in-lieu fee for the development of nine total units. The in-lieu fee for each unit is a development of from one to eight units is eleven percent of the fee calculated for nine units.

Incentives

  • (not offered)clustering of IH units
  • (not offered)delayed building of IH units
  • (offered)density bonus
  • (not offered)fast-track processing
  • (not offered)fee deferral
  • (not offered)fee reduction
  • (not offered)fee waiver
  • (not offered)flexible design standards
  • (not offered)growth control extension
  • (not offered)subsidies
  • (not offered)tax abatement
  • (not offered)(other)

Requirements

  Rental Units Ownership Units
IH Requirement Threshold 1 units 1 units
% Production Required fixed formula; 25% fixed formula; 25%
Targeted Groups
  • (not offered)extremely low income
  • (offered)very low income
  • (offered)low income
  • (offered)moderate income
  • (not offered)above-moderate income
  • (not offered)senior
  • (not offered)extremely low income
  • (offered)very low income
  • (offered)low income
  • (offered)moderate income
  • (not offered)above-moderate income
  • (not offered)senior
Length of Affordability 55 years 55 years

Production Data

Production data not available for this jurisdiction.


Residential building permit activity 5 years before and after adoption of ordinance:

last updated July 5, 2007